Measurement of low carbon...Measurement of low carbon building performance student placement project During the summer months SETIC has engaged a student to undertake the following The objectives of the student placement were: 1. To identify the measurements which must be made 2. To gather historical data which can be used as a pre-project datum 3. To specify suitable instrumentation and logging systems to record the required data 4. To develop a method of assessing the building’s energy performance which is not influenced by ambient conditions. 5. To determine the impact of energy recovery from heat rejection and electrical outputs from test rigs in the ETC The selected student, Ellen Upton, is currently studying for an MSc in Carbon Management at Building Warrant Approval This week SETIC has received the necessary Building Warrants for the REGAIN refurbishment. This, in UK, is the technical approval from the Local Authority to proceed with the building phase of the project. This approval contains a number of changes that we now will require to formalize with our proposed Contractors. The Tender process is now also nearing completion with the list reduced to 2 companies currently finalizing their tender price to account for these amendments. |
Selection of Contractor & Links with Colleges 14 October 2010 The selection of the Contractor is drawing towards the end of the process and SETIC hope to... Lire la suite |
Measurement of low carbon... 3 September 2010 Measurement of low carbon building performance student placement project During the summer... Lire la suite |